Bijar Jumbo Direct Reduction Plant (PERED Jumbo Plant CDRI 1.600 MTPY)

  • Bijar Direct Reduction EPC Project is a DRI Plant with a capacity of 1/6 million tons per year working with the PERED technology. It is under construction in Bijar, Kurdistan province.
  • This project is the first ever mega module with the technology of PERED which the Basic Engineering was done by MME.
  • The client of this project is Kurdistan Steel Industries (K.S.I. Co.) and the consultant is Aseh Sanat Engineering Co.
  • Project construction duration is 36 months and 12 months for operation service is in the commitments of MME.
  • All of the main and technological equipment are in the scope of work of MME and are all being procured from the best local and international vendors.